BUILD TIMES ARE LIKELY TO INCREASE ON ORDERS PLACED DURING THE HOLIDAYS - PLEASE CONTACT US FOR UPDATED BUILD TIMES!!

Shipping & Build Times

Most products are built to order, build times are not guaranteed. Build times may increase during the holidays due to increased order volume. If you need your order by a certain day, please email us prior to ordering and we would be happy to help you out.

Shipping times for all products in the continental USA is typically 3 to 8 days if shipped via FedEx Ground. 

 Current Lead Times:

-Bash Bars (raw steel) – 2 to 3 weeks

-Drag Parachute Bars (raw steel) – 2 to 3 weeks

-Drag Parachute Bars (powder coated) – 3 to 5 weeks

-Oil Catch Cans (raw aluminum) – 2 to 3 weeks

-Oil Catch Cans (anodized and powder coated) – 2 to 4 weeks

-Coolant Overflow Tanks (raw aluminum) – 2 to 3 weeks

-Coolant Overflow Tanks (anodize and powder coated) – 2 to 4 weeks

Close (esc)

Popup

Use this popup to embed a mailing list sign up form. Alternatively use it as a simple call to action with a link to a product or a page.

Age verification

By clicking enter you are verifying that you are old enough to consume alcohol.

Search

Shopping Cart

Your cart is currently empty.
Shop now
x

x